







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Marina del Rey
Adding living space in Marina del Rey is not the same as adding it inland. Here, nearly every project contends with the marine layer, constant salt spray, and a coastal permitting path that shapes what you can build before a single nail goes in. We work with homeowners throughout Marina del Rey on additions and ADUs with that reality baked in from the first sketch. Our technicians have up to 14 years of experience, and our estimates are free. Call (844) 320-4724 to schedule yours. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Why Marina del Rey Homeowners Call Construction Inglewood for Home Additions & ADU

We handle additions and ADUs as one part of a full-scope residential construction company, which matters in a coastal building where a new roofline, window package, and exterior finish all have to agree with each other. That means one contractor from the driveway to the ridge line, not a rotating cast of specialists handing off blame.
Our reputation in Marina del Rey comes from doing the unglamorous part well: the permit packet, the material specification, the sequencing. When a plan needs Coastal Commission review, we file it and we wait with a construction schedule that doesn’t leave a half-built shell exposed to the weather. Homeowners who’ve worked with us in this community tend to come back for the next phase of the property, from a second story addition to a new detached ADU.
We know the local building stock here, and we know what survives the salt fog. Our technicians have up to 14 years of experience working coastal and inland jobs, and they’ll tell you plainly which hardware and assemblies hold up on the water and which don’t. That knowledge is the difference between an addition that looks right for a decade and one that starts rusting by the first Santa Ana wind season.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Marina del Rey
ADU Design & Permitting in Marina del Rey
A Marina del Rey ADU lives or dies on its permit packet. Plans that ignore Coastal Commission design guidelines come back for redesign, and redesign is where budgets bleed. We build the submittal around the coastal requirements from the start: heights, setbacks, colors, materials, and the drawing set a review board actually expects to see. You get the design work and the filing handled as one piece.

Garage Conversion ADU in Marina del Rey
Converting a garage is often the most practical path to added living space in a condo-heavy waterfront community where open land is scarce. It still needs the same coastal attention. Plumbing, electrical, and ventilation have to be detailed so marine-layer moisture doesn’t migrate into the new interior, and any exterior changes to the garage face get reviewed. We scope the whole conversion, from utility rough-in to finish.

New Detached ADU in Marina del Rey
A new detached ADU is the biggest swing, and on a coastal lot it’s the one most likely to draw serious review. We can work with prefab and modular specialists including Abodu, Cover, and Dvele, which shortens time-to-occupancy and gives you a unit engineered around local code from the factory floor. If a site-built structure fits your lot better, we run that too. Either way, 316-grade stainless fasteners and weather-tight assemblies go in as the default, not an upgrade.

Junior ADU & Interior Conversion in Marina del Rey
A junior ADU or interior conversion carves new living space out of what you already own, often within an existing 1960s or 1980s building. That makes HOA review and building-department coordination part of the job. We plan the conversion so the new space reads as part of the home, not a bolted-on afterthought, and we sequence the work to keep disruption contained.
Trusted Brands We Service in Marina del Rey
We maintain partnerships with more than 50 named brand-material suppliers across every category, and we bring the ones that fit a Marina del Rey project. For ADUs and additions, that includes relationships with prefab and modular specialists like Abodu, Cover, and Dvele, so you’re choosing between real, warranted products instead of taking whatever’s on hand. We don’t stock parts in a local yard and we don’t claim to; what we do is specify known brands and get them on site for your build. You choose the material by design, warranty tier, and budget. We handle the rest.
Common Home Additions & ADU Problems We See in Marina del Rey Homes
Marina del Rey is a built-on-water community, and its problems are water-and-salt problems more often than they’re structural ones. A few things we see again and again:
- Hardware that rusts in months. Standard galvanized fasteners and hardware can pit and seize in the salt fog, so qualified local pros specify 316-grade stainless steel from the start. Inland projects often get away with ordinary hardware. Waterfront ones don’t.
- Plans that miss the coastal guidelines. Submitting a design without addressing Coastal Commission review triggers redesign and delay. Getting the submittal right the first time is the cheaper path, every time.
- Exterior finishes that fail early. The marine layer keeps humidity high, and Santa Ana winds dry and crack sealants and membranes. Underestimating that means paint and caulk giving up long before they should.
- Aging plumbing and windows in older buildings. Many mid- and high-rise buildings here still carry original aluminum-framed windows and galvanized or copper plumbing that corrode in the salt air. An addition has to tie into what’s actually there, not what the drawings assume.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Marina del Rey, CA

Honest numbers for this market, as typical estimated ranges:
| Project type | Typical estimated range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves a project within those ranges: whether Coastal Commission review is required, the material spec (316-grade stainless and weather-tight assemblies cost more than standard hardware and save money later), site access, utility work, and how much of the existing structure needs correction before the new work can start. These are estimates. The written estimate sets the final price, and it’s free. Call (844) 320-4724 for yours.
We Also Serve Cities Near Marina del Rey
We work with homeowners in Culver City, El Segundo, Lennox, and View Park-Windsor Hills as well, and you can see the full scope of our Home Additions & ADU capability on our main page. The coastal conditions differ from the inland neighborhoods, so the material spec changes with the address. Call (844) 320-4724 to talk through your property.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Marina del Rey

In many cases, yes. Nearly every addition or ADU on a waterfront lot in Marina del Rey triggers Coastal Commission review, and the design has to address those guidelines in the submittal. We build the drawings around the coastal requirements from the first draft so review doesn’t force a redesign. Call (844) 320-4724 and we’ll walk through what your property likely faces.
The right ones are corrosion-resistant: 316-grade stainless fasteners and weather-tight assemblies designed for horizontal rain driven by onshore winds. Standard galvanized hardware can rust within months in the salt fog. We specify the coastal-appropriate hardware and finishes from the start, not as an afterthought. Call (844) 320-4724 for an estimate that reflects the real material spec.
It adds time to the calendar, and the exact duration depends on the review body and how complete your submittal is. That’s why we treat a complete packet as the priority and sequence the construction schedule around approval, so framing and rough-in wait rather than sit half-finished in the weather. Call (844) 320-4724 to plan your timeline.
We do. We handle the permit submittal, including the Coastal Commission review where it applies, as part of the job. You get one point of contact and a packet built to pass review. Call (844) 320-4724 to start yours.
Often, yes, and a garage conversion is typically the most practical route to added living space in a community where open land is scarce. It still needs coastal attention for plumbing, ventilation, and any changes to the garage face. A typical garage conversion here runs about $30,000 – $80,000, and the written estimate sets the final price. Call (844) 320-4724 for a free estimate.
Ready to Plan Your Addition or ADU in Marina del Rey?
If you’re weighing a second story addition, a new detached ADU, or a garage conversion, the first move is a free estimate. We’ll look at your property, the coastal requirements it faces, and the material spec that holds up in the salt air, then put it in writing. Call (844) 320-4724. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Construction Inglewood.












